Category A project B&H Corridor Vc in FBiH – part 3 (Tranche II) Mostar South – Tunnel Kvanj
Documents for download:
Volume 2: Technical Annexes for Sub-Section Mostar South Interchange to Tunnel Kvanj
Volume 4: Biodiversity Management Plan for Sub- Section Mostar South Interchange to Tunnel Kvanj
Volume 5: Non-technical Summary for Sub- Section Mostar South Interchange to Tunnel Kvanj
Volume 6: Stakeholder Engagment Plan for Sub- Section Mostar South Interchange to Tunnel Kvanj
JPAC press release on the progress of pre-construction activities for Motorway Section Mostar South Interchange to Tunnel Kvanj
EBRD Loan for Corridor Vc – in Federation of B&H Part, Putnikovo Brdo – Medakovo
Documents for download:
EBRD Loans for Corridor Vc – Part 2 and 3
The Project involves the construction of the following seven sections listed from North to South:
10.4 km section between Svilaj and Odžak (Lot 1)
5. 1 km section Poprikuse – Nemila (Lot 2)
5.8 km section Donja Gračanica – Klopče (Lot 2)
3.9 km section between Donja Gračanica and Zenica Tunnel (i.e., 2.1 km motorway section between Donja Gračanica and Zenica North and 1.8 km motorway section Entrance into Tunnel Zenica – Zenica North Interchange/ Donja Gračanica) (Lot 2)
2.0 km Tunnel Ivan within the section Tarcin- Tunnel Ivan (Lot 3)
7.2 km section from Buna to Počitelj (Lot 4)
Documents for download:
Decision on Environmental permit – Tarčin – Zukići
Resettlement Action Plan (RAP) for the section Donja Gračanica-tunnel Zenica
Land Acquisition Plan – subsection Buna – Počitelj
Supplementary Biodiversity Assessment
Environmental and Social Action Plan
Framework Biodiversity Management Plan
Tunnel Zenica – Land Acquisition and Resettlement Plan
Land Acquisition and Resettlement Framework for Corridor Vc – March 2017
Environmental & Social Action Plan Route Donja Gračanica – Klopče and Svilaj – Odžak